MRL Furnace
Sample preparing
- Put three of clean wipers onto the desk in front of the H16 Acid hood
- Bring the elephant onto the desk
* Uphold the elephant carefully
- Pull the glass wafer holder out from the elephant with a cleanroom wiper
- Load your wafers with Teflon tweezer in the H16 hood
- Put the glass wafer holder into the elephant with a cleanroon wiper
- Place the elephant onto deck of the furnace
Tool initializing
- Login the tool
- Double-Click the "Sentinel B" icon in the left bottom
- Click the "File" tab and Select the "Log In" in the Palette window
- Sentinel User ID : operator, Sentinel Password : guest1
- Click the "Zone/Tool" tab and Select "C4" and Select "Gate_OX" or "Field_OX"
- Click the "Tool Status" icon
- Click the "Detail" button to check 'Run Number' and Compare it with log book
- Click the "File" tab in "VTR Status" window and Select the "Exit"
- Leave "Tool Status" window open
- Click the "Run Tool" icon in the Palette window
- Select the "Recipe" you want and Check the Tool you want
- Click the "Run Minispec" button and "Run Tool Login" window will pop up
- User Id : operator and Click the "OK" button
- "Operator Step Time Entry" window will show up
- Enter the operation time and Click the "OK" button
- "Information" window will show up and Click the "OK" button
- Once "Download Successful" shows up, then Click the "OK" button
- Click the "File" tab in the "Run Tool" window and Select the "Exit"
- Click "Control" button in the "Tool Status" window
- Control Panel will show up and Select "Start" button
- Check if "Process State" is "Hold" in the Tool Status window
Sample loading
- Wear "Insulated glove" and Open the furnace lid
- Place the elephant to the furnace entrance
- Bring the wafer loading stick and Insert it through the hole onto the elephant
- Load the wafer holder into the furnace until a thumb touches the elephant
* During loading process, Uphold elephant to remove any leveled area with the furnace entry
- Once loading is done, Wear "Insulated glove" and Close the furnace lid
* Do not close the lid tightly
* Make sure the exhaust tube towards exhaust hole in the furnace
- Press the "Hold" button in the "Control Panel"
- Check if the "Process State" is running and the "Step Name" is "ramp"
- Hide your "Control Panel" window to avoid someone ruin my process
- Place your stuff onto the deck to let others know I am using the tool
Sample unloading
- Wear "Insulated glove" and Open the furnace lid
- Place the elephant to the furnace entrance
- Bring the wafer loading stick and Insert it through the hole onto the elephant
- Unload the wafer holder from the furnace
* During Unloading process, Uphold elephant to remove any leveled area with the furnace entry
- Once unloading is done, Wear "Insulated glove" and Close the furnace lid
* Do not close the lid tightly
* Make sure the exhaust tube towards exhaust hole in the furnace
- Leave the elephant onto the deck and Cool down for 15min
- Logoff the tool
Finalizing
- Put three of clean wipers onto the desk in front of the H16 Acid hood
- Bring the elephant onto the desk
* Uphold the elephant carefully
- Pull the glass wafer holder out from the elephant with a cleanroom wiper
- Unoad your wafers with Teflon tweezer in the H16 hood
- Put the glass wafer holder into the elephant with a cleanroon wiper
- Place the elephant onto deck of the furnace
You can leave now :)
when the tool fails process ...
If the step name is changed to "AnalogFLT" - > check O2 valve
Click the "Abort" button on control panel, then Step# is changed to 13.
Click the "Hold" button on control panel to make Process state "Idle"